Premium jacketing with multiple plug options
Plug and socket hybrid technology reduces downtime
7-way coiled cables with quality jacketed protection
Standard 7-way NON-ABS coiled assemblies
Standard Non-ABS 7-way coiled assemblies
Value without sacrificing corrosion protection
Our best auxiliary coiled cable - avoids signal noise
Standard auxiliary coiled cable
Quality jacketing with mutiple plug options
Durability & strength for NON-ABS 7-way applications
For trailer doubles utilizing dolly applications
Weather-proof light-duty 6 and 4-way coils
Charging for truck mounted applications like forklifts
Premium Back-of-Cab Charging System
Dual pole plug connection with corrosion protection
Strength and durability for your liftgate connection
Dual pole cable with quality jacketed protection
For fleets with single and dual pole trailers
For dual to single pole applications featuring a dual pole weather-proof connection for corrosion prevention
Connects a dual pole tractor to a single pole trailer
Durable single pole coiled assemblies
Durable single pole straight assemblies
For auxiliary applications such as tarps
Best coiled air for extreme weather conditions
Premium coiled air with POWER GRIP™ leverage
Heavy duty coiled air built avoid kinks and damage
Heavy duty coiled air with gladhands built to last
Standard coiled air to connect tractor to gladhands
Black nylon coiled air with fittings for fifth wheel
Heavy duty straight rubber air with swivel fittings
Spiral wrapped for clean appearance and protection
Bulk heavy duty rubber hose for air brakes
Quick and easy trailer wiring management
Easily adaptable to most trailer wiring systems
Heavy duty intermittent solenoid for use on liftgates
Heavy duty continuous solenoid for use on liftgates
Reinforced zinc die-cast housing for durability
Charging plug ideal for dump truck applications
Unbreakable and corrosion resistant replacement plug
Prevents kinking and offers strain relief for cables
Plug-in replacement cartridge for QCP™ assemblies
For Phillips electrical assemblies
Replacement seal for WEATHER-TITE™ PERMAPLUG™
Molded for moisture and corrosion resistance
Non-corrosive housing for light duty applications
Unbreakable and corrosion resistant plug
Prevents corrosion from entering electrical system
Non-corrosive socket for ISO applications
Molded housing seals out moisture and corrosion
Significantly reduces socket replacement time
36" extension cable for QCS2® system
Zinc die-cast for strength and durability
Non-corrosive socket with blunt cut cable ends
Dual pole and single pole sockets for convenience
Durable and impact resistant dual pole nosebox
Socket swivels side to side to prevent cable damage
Zinc die-cast housing for strength and durability
Quick and easy protection against corrosion
Includes everything needed for installation
Gasket slows down the effects of corrosion
Replacement socket lids
Socket boot for added protection against corrosion
Replacement gasket for sockets
For mounting 7-way sockets
7-way socket swivels side to side preventing damage
7-way and gladhands swivel for maximum protection
Pre-drilled mounting holes offer quick installation
Over 65% more working room than traditional noseboxes
Over 50% more working room than traditional noseboxes
Designed for tight spaces with maximum interior room
Quick and easy maintenance and corrosion prevention
Socket for SAE J560 coiled and straight cables
28 pin connector allows 4 connections per 1 circuit
Socket for ISO 3731 coiled and straight cables
For applications where flush mount is required
Extended Barrel provides additional plug support
Inner cavity is STA-DRY® sealed to prevent corrosion
Fits 15 or 16 series socketbreakers
3 1/8" deep - Fits 15 or 16 series socketbreakers
1 7/8" deep - Fits 15 or 16 series socketbreakers
Allows a standard socket to be mounted on a nosebox
Zinc die-cast for added protection and strength
Ensures harness system is sealed against corrosion
For Phillips socketbreakers that require a breaker
Water resistant and can be panel or surface mounted
30 amp in-line fuse holder for ATO/ATC fuses
Improve control with 50% faster trailer brake release
Factory components to service QWIK-E® gladhands
Improves trailer parking brake response time
For quick release of air from air brake system
Designed for durability and strength
The ultimate in durability and strength
The ultimate protection against corrosion
Push-to-connect installs up to 42% faster than brass
Protects air fittings from the elements
Plugs and seals unused air fittings
310 QWIK-FIT™ pieces
48 QWIK-FIT™ pieces
110 QWIK-FIT™ pieces
Provides a positive lock for gladhand mating
Helps prevent accidental gladhand disconnections
Swivels 180° to prevent air line kinking
Prevents debris from entering air system
Prevents air line kinking and accidental disconnects
Protects air system against debris and corrosion
Seals rear gladhands for double trailers
Air line filtration system and swinger gladhand combined
Ultimate defense against debris entering air system
For the ultimate defense against debris
Helps keep debris out of air lines
Provides extra leverage for handling gladhands
Prevents air from escaping air lines
For added support and protection against kinking
Temporarily fix damaged air coils to reduce downtime
Prevents unauthorized trailer movement
To repair or replace 1/2" NPT
To repair or replace rubber air hose ferrule
To repair or replace end of rubber air hose
Brass valve and vinyl coated cable resists corrosion
Automated air tank protection for brakes and other air-operated systems
Temporarily fix damaged rubber air lines
Meets SAE J844 type "A" specifications
Meets SAE J844 type "B" specifications
Made of brass for added strength and durability
Our complete premium back-of-cab system
Our Essential Back-of-Cab System
Our Superior Back-Of-Cab System